Radiance Platinum
Radiance Platinum
  • 3 & 4 BHK

    Luxury Apartments (B+S+13)

  • Development Size: 1.23 acres

    No. of Units: 62 Apartments
    Completion Date: June 2027

Radiance Apartment Family

Radiance Platinum | Apartment In Koramangala, Bangalore


PRM/KA/RERA/1251/310/PR/060824/006962

Radiance Platinum
CRAFTING EXCLUSIVE LIFESTYLES, DELIVERING EXCELLENCE
Radiance Platinum emerges from Radiance Realty, Chennai's most trusted luxury Developer. With an illustrious portfolio setting high standards in quality and value, our legacy extends across Chennai, Coimbatore and Bengaluru. INNOVATIVE, CUSTOMER CENTRIC LIVING Every project reflects our commitment to innovation, perfection, and customer-centricity, Offering modern designs and the latest amenities for a truly luxurious lifestyle.

A minutes away from hospitals, schools, colleges, entertainment areas, restaurants, and upcoming IT/ITES zones.

×
  • delivering only the best
  • affordable homes
  • top class amenities
  • eco-friendly projects
  • Hospitals
  • Schools
  • Colleges
  • Hotels
  • Place of Worship
  • Neighbourhood Areas
  • Entertainment Spots
type Built up area Rate Per. Sq.ft. Price Range
3 BHK Apartments (B+S+13) 2286 Sq.ft. - 2319 Sq.ft. Rs.14499 Rs. 3.74 Cr* - 3.79 Cr* (All Inclusive)
4 BHK Apartments (B+S+13) 3056 Sq.ft. -3064 Sq.ft. Rs.14499 Rs. 4.96 Cr* - 4.98 Cr* (All Inclusive)

1

Appreciation is Guaranteed

2

Gated Community Living

3

High Return On Investment

4

Superior Quality

GYM

Swimming Pool

Multipurpose Hall

Indoor games room

Yoga Deck

CCTV

24/7 Power Backup

Lift

Security

Kids Play Area

Table Tennis

Dart Board

Chess

Carrom

Barbeque Counter

Tot Lot

Senior Citizens Nook

Foos Ball

Snooker table

Reflexology park

Business center

Hamock Garden

Open Gym

Yoga/ Meditation garden

Kids Pool

    Masonry
  • RCC framed concrete structure
  • Earthquake resistance structure adhere to seizmic zone II
  • Anti-termite treatment during stage wise construction
  • AAC light weight blocks for internal and external masonry walls
  • Solid concrete blocks for other masonry walls as per requirement in Basement & Stilt
    Foyer, Living , dining & passage floor
  • Marble flooring
  • Master bedroom floor
  • Engineered Wooden flooring with 8mm thickness
  • Other bedrooms, kitchen & family room floor
  • vitrified floor tiles of suitable size
  • Balcony, utility & toilet floor
  • Anti skid ceramic floor tiles of suitable size
  • Common staircase
  • Granite as per architect design
  • Ground floor lobby
  • Granite as per architect design
  • Typical floor corridor & lift lobby
  • Vitrified tiles as per architect design
  • External driveway
  • Interlocking concrete paver blocks / Granolithic screed concrete floor
  • Basement car park floor
  • Granolithic screed concrete floor
  • Kitchen wall dado
  • Cement plaster finish, for 600mm height above counter no tiles
  • Toilet wall
  • Glazed ceramic tiles up to door lintel level
  • Utility wall
  • Glazed ceramic tiles from floor up to 4 feet height
  • Lift facia wall
  • Granite as per architect design
    Water point with tap in Kitchen
  • Will provide separate taps for municipal water and domestic water in kitchen sink location
  • Water point with tap in Utility (wherever applicable)
  • Domestic water in utility sink location
  • Washing machine water point
  • Will be provided in utility
  • Granite with sink
  • Will be provided in utility
  • Water purifier point
  • Will be provided in kitchen
    Main Door
  • 8 feet height factory made door, 35mm thick flush shutter with both sides veneer finish, hardwares & digital lock system of DORSET / equivalent make.
  • Bedroom Door
  • 8 Feet height factory made door, 30 to 35mm thick flush shutter with both sides laminate finish, hardwares of DORSET / equivalent make.
  • Toilet Door
  • 8 feet height factory made door, 30 to 35mm thick flush shutter with both sides laminate finish, hardwares of DORSET / equivalent make.
  • Window & French Door
  • UPVC / Aluminium sliding windows with clear glass
  • UPVC / Aluminium sliding french door with clear glass
  • Ventilators
  • UPVC / Aluminium ventilators with swing open shutters, lock & key for shaft access area
  • UPVC / Aluminium ventilators with swing open shutters for non access areas
  • Toilet false ceiling
  • Grid type false ceiling as per architect design
  • Balcony railing
  • Glass railing as per architect design
  • Internal Staircase Railing
  • Glass railing as per architect design
  • Common Staircase Railing
  • Aesthetically designed MS railing
    Internal Walls
  • 2 coats of Asian / Berger / Dulux / equivalent emulsion paint over base primer & putty
  • Exterior Walls
  • 2 coats of Asian / Berger / Dulux / equivalent exterior emulsion paint over texture
  • Ceiling
  • 2 coats of Asian / Berger / Dulux / equivalent emulsion paint over base primer & putty
  • MS Railing
  • 2 coat of Satin enamel paint of Asian / Berger / Dulux / equivalent over primer
    Sanitary ware
  • Premium range Toto / Kohler / equivalent
  • CP fittings
  • Premium range Toto / Kohler / equivalent
  • Closet
  • Wall mount type EWC (European water closet) with wall concealed tank, health faucet
  • Overhead Shower
  • Single lever concealed diverter with over head shower and spout in all toilets
  • Rain shower head for all the toilets except servent toilet (wherever applicable)
  • Washbasin
  • Counter wash basin with polished granite in all toilets & dining room
  • Pipe lines
  • UPVC & CPVC water pipe lines, PVC soil, waste & rain water pipe lines shall be of ISI certified brands like Aashirwad / Astral / Supreme or equivalent
    Switches and Sockets
  • Legrand / Equivalent

  • Wiring
  • Fire Retardant Low Smoke (FRLS) copper wire of quality ISI brand POLYCAB / KEI / equivalent
  • Hi wall / Split AC Point
  • Provision with electrification in Living / Dining room & all bedrooms
  • TV & Data Point
  • Provision with electrification in Living / Dining room & all bedrooms
  • 2 Way Control Switch
  • For light and fan point in all bedrooms
  • DG Power Backup
  • 2000 Watts each unit
  • 20Amps Point
  • For water heater with electrification in all toilets
  • 15Amps Point
  • For refrigerator, microwave oven, Dishwasher in kitchen and for washing machine in utility (4 No's)
  • 5Amps Point
  • For chimney, water purifier, mixer / grinder in kitchen and for exhaust fan in all toilets (4 No's) & 1 additional for Balcony )
    Power back up
  • DG power back up for 100% common area
  • Common Lift
  • Passenger lift/ Service lift of adequate capacity
  • External
  • Landscape & hardscape as per architect design
  • Boundary
  • 6 feet height compound wall as per architect design
  • Water Flow Meter
  • Water flow meter for the domestic water line in each unit
  • Video door phone
  • Video door phone of Godrej/ Panasonic/ equivalent make in each houses integrating to the main entry gate
  • Treatment Plants
  • Sewage treatment plant and water softening plant
  • Surveillance system
  • CCTV camera surveillance system, entry portal & security cabin with boom barriers

May 2025

April 2025

March 2025

Feb 2025

Jan 2025

Radiance Project Consultant

Enquire Now

    I agree to the terms and conditions